
The entry below is made up to show the layout. Copy the template and write your own dates, notes and photo captions.
| Field | Your entry |
|---|---|
| Date | |
| Part | |
| What I did | |
| Hours | |
| Problem | |
| Fix | |
| Photos taken |
Date: 2026-01-26. Part: chest armor. Did: heated and bent the foam, glued the side seams. Hours: 3. Problem: seam lifted at the edge. Fix: re-glued and clamped overnight. Photos: three, same angle as 2026-01-12.
| Stage | Photo | Caption format |
|---|---|---|
| Raw | Material with a ruler | date |
| Shaped | Piece on the table | date |
| Painted | Piece in daylight | date |
| Fitting | Piece on the body | date |
Log right after each session while you remember. Use the same angle and light for each stage. Name photo files by date and part. Back up weekly. A dated log turns into a build book fast.
The Build Book Pack in the Slatesource shop has stage layout, gallery and timeline chips in one go. Use the creator code BUILDBOOKSTUDIO for 10 percent off. The author of this page earns a commission when you use the code.
Questions about this log
Leave a message and I will reply.